The Naples Players Theatre29giw4V2a)2022-08-23T19:55:59+00:00
Rendering of the north facade renovation along 4th Ave S. The new Youth Theater is the large glass form on the right, also seen are the new patron balcony overlooking the street and the new costume shop on the left.
The new Youth Theatre will be placed on the third floor, above the existing black box theater. It features a large glass curtain wall for daytime performances with a theatrical drape covering for nighttime shows.
Site Plan
Existing Plaza Entrance
Our renovation proposes to preserve the plaza entrance off 5th Ave S, which has become a landmark of downtown Naples.
Existing Plaza Entrance
Our renovation proposes to preserve the plaza entrance off 5th Ave S, which has become a landmark of downtown Naples.
These images show what the building looks like now, versus what it will look like after our proposed renovation.
Theater Concept
Conceptual rendering of the main theater used in the design process.
Our renovation of the main theater includes removing the dropped ceiling to add balcony level seating, increasing the number of seats available in the theater by over 100. This design does not require enlarging the space or removing the existing roof structure.
Main Theater Section
Rendering of Main Theater
Rendering of Main Lobby
The renovation of the lobby consists of opening up the left wall with floor to ceiling glass, a new grand staircase to access the second floor lobby and balcony seating, and new concessions and ticket sales areas.
Concept Rendering of North Facade
The renovation is proposed to begin construction in 2023 with completion in 2024. The project is registered with USGBC for the goal of LEED Gold certification.
Concept Rendering of North Facade
The renovation is proposed to begin construction in 2023 with completion in 2024. The project is registered with USGBC for the goal of LEED Gold certification.